WellTech team laying HDPE pipes on site

From wellhead to outfall.

Temporary and permanent HDPE networks that collect, transfer and discharge water to approved points, engineered and built in-house.

Every groundwater system ends at a discharge point, and that point is often far from site. We design the route, secure the approvals, weld and lay the pipe, and operate the transfer.

HDPE & Water Transfer Networks

Designed by our engineers, delivered by our own crews and equipment, and supported 24/7.

Discuss a project
Capability

What it covers

HDPE pipeline systems

Design and installation of HDPE networks for groundwater, discharge and water transfer.

Fusion welding

In-house technicians and butt-fusion welding equipment for pipelines of any size.

Temporary discharge networks

Layflat hose, PVC and HDPE routes for the construction period, removed when no longer needed.

Permanent networks

Collection and transfer lines designed for continuous duty.

Long-distance pumping

Booster pumping and hydraulic design for long transfer routes.

Road crossings

Crossings planned and executed with the relevant authorities.

Authority coordination

Discharge permits and route approvals, with validity tracked through the project.

Collection networks

Collector mains linking wells and pumping stations.

Start a conversation

Bring us in before the first excavation.

Share the drawings, soil investigation and groundwater levels. Our engineers will review them and recommend the right groundwater strategy.

Request a technical assessment